How do you handle timing when the capture flop frequency is twice the launch flop frequency?

oTools calculate phase shift as explained below. If same clock drives launch and capture, phase shift is equal to one clock period.

  • Timing Analysis Approach:
  • Phase shift = time period of capture clock in this case.
  • It may need MCP if required.
Share:
‹ How to analyze a timing report?
Home
How do you fix setup violations? What if upsizing/layer change isn't possible? ›