What are the inputs required at the start of PnR?

  • Gate-Level Netlist:
  • Timing Libraries (.lib or .db**)**
  • Physical Libraries (.lef**):**
  • technology process rules (tech LEF).
  • Timing Constraints (SDC - Synopsys Design Constraints):
  • Power Intent (UPF/CPF - Optional but common):
  • RC Extraction Files (Optional initial estimate, more critical later): tlu+, qrcTech
  • Floorplan Definition File (DEF - Optional):
  • Scan Definition File (Scan DEF - Optional):
  • MMMC (Multi-Mode Multi-Corner) Setup File